Co-Op Student Evaluation Project
Meeting Minutes - 12/14/04
- Dr. Naveda suggests that we talk to other students to determine how they would like the forms to be.
- Don't know where the system is going to 'sit'
- JobZone, SIS, etc.?
- If it's on JobZone, we would prob. have access to information from co-op register form
- Our system will not (currently) be tied into any other systems.
- Our system should be able to get information from either the co-op registration
form or from other RIT databases (LDAP, etc.), or possibly both.
- Students should have the ability to look at past co-op evaluations.
- Should be able to see both their own and their employer's evaluations.
- Should be a low-cost feature, and would likely be beneficial.
- Student & employee evaluations should be linked.
- Students should be able to see if their employer has submitted an evaluation for their current co-op.
- The system should not use JavaScript or cookies (as a security & reliability concern).
- All state should be server-side.
- Some common problems with existing system(s) are incorrectly entered dates and email addresses by students.
- We should try to determine ways to lessen the possibility of these errors in our system.
- Might want to think of ways to use confirmation through email messages.
- Jim (and co-op department) would like the following:
- To have all faculty members have access to the system.
- To have the system go through ITS' current systems (help-desk, etc.).
- To use existing systems for managing username & password information.
- When an incomplete form is saved, where should the data be stored?
- Could possibly be stored in a new database table, or possibly in the table used for the complete form information.
- The employee evaluation system used the following status information for evaluations:
- 100 - pending
- 150 - pass pending
- 200 - partially complete
- 300 - complete
- When a student comes back to a saved (partially completed) form, what will he or she see?
- Any questions not completed should be highlighted both through the use of color and some sort of icon.
- Possibly un-highlight the questions as they are filled out.
- Visual disabilities should be taken into consideration when determining how to highlight the questions.
- Once the form has been submitted, the system should give confirmation in the following ways:
- System should send the student a confirmation email.
- System should display a confirmation message and the completed form.
- Are student advisors still going to send email reminders (to fill out evaluations) once the
system is up-and-running, or are they going to depend on our system to send the reminders?
- The system should notify students if they haven't completed their evaluation.
- Dr. Contomanolis may give us some standard reports that the system should be able to do.
- Dr. Naveda suggested letting users select combinations of data that they want to view.
- System should be able to export to both CSV (comma-separated value) and MS Excel formats.
- Users should be able to pull up information by quarter or status.
- Jim stated that the reporting is going to be mostly done by departments, not by the co-op office.
- The co-op office will mostly be viewing the evaluations.
- When forms are changed, when should the change be reflected in the form shown to the students?
- Should students be able to change email (or any other possible) preferences through the system?
- This will depend on where the information is stored.
- Whe will edit the forms (co-op office, individual departments, both)?
- How are the forms currently modified (new ones added, old ones modified)?
- Should this be changed at all?
- How are new forms brought on line?
- How are we going to get student email addresses if they haven't used our system before?
- Where does the employee system get their email addresses?
- Confirmation of email addresses should probably be handled by the co-op registration form.
- How will the system get the students currently on co-op?
- Need to go over concept diagram with Dr. Contomanolis & Jim.
- Weren't able to get a list of issues that ITS encountered or changes they made.
- Need to get a concept of the form layout (and possible breakup).
- Need to try and determine what the peak load is on the current system.
- We need to find out how much access we are going to have to the new LDAP system.
- By the end of this week (12/17/04), we need to have the following completed:
- A (tentative) schedule for the project. — Chris
- A list of all requirements / main features determined up to this point. — Entire Team
- Investigation into bug/feature tracking software (most likely Bugzilla) and how to get it running on our team account. — Tom
- An updated project plan document. — Patrick
- Investigation into development tools & set up development box. — Dan