Status of Project
Current Phase: Post-Mortem
Latest Updates:

21 May 2004

- Lunch with sponsors

4 May 2004

- Schedule changes, Phase Gate Develop moved to overlap with Phase Gate Develop

5 April 2004

- Updated Detailed-Level Design document

- Uploaded Technology Comparison Paper

3 April 2004

- Converted all documents into PDF format

- Updated links in the Documents page

1 April 2004

- Uploaded High Level Design

- Phase Gate Design Passed

Weekly Report:

2004-01-20 to 2004-01-26

2004-01-13 to 2004-01-19

2004-01-06 to 2004-01-12

2003-12-16 to 2003-12-22

2003-12-09 to 2003-12-15

2003-12-01 to 2003-12-08