SWEN-261: Intro to Software Engineering

Midterm Sprint Retrospective (individual)

Before executing this assignment, please watch the corresponding videos and take the quiz.

Spend several minutes and think about your last sprint. Think of how well or bad the team performed in different aspects of the project / process / team work. Think what was the main reasons for that performance. Based on that analysis, try to answer on the following questions:

  • What should I/we start doing?
  • What should I/we keep doing?
  • What should I/we stop doing?

Create a document and list at least 4 items (start / keep / stop) in total there (if you list more than five legit items, you will earn a bonus point). Among the items, try to include at least one "start" item, one "keep" item, and one "stop" item. Use a separate paragraph (or list item) for each sprint issue.

Coming up with ideas can be challenging on your own so here are a few topics to consider:

  • Adding, removing or improving processes:
    • Backlog refinement
    • Sprint planning
    • Daily standups
    • Sprint review/demo
    • Sprint retrospective (the meta process)
  • Adding, removing or improving testing:
    • Unit testing
    • Unit testing code coverage
    • Acceptance (manual) testing
  • Adding, removing or improving reviews:
    • Code reviews
    • Reviewer engagement
    • Pre-development design reviews
    • Pre-planning design reviews
  • Adding or improving developer or team skills:
    • Better use of Spikes
    • Addition of tech talks
    • Formal member training
  • Adding or improving team communication:
    • Better use of communication tools
    • More (or less?) face-to-face meetings
    • Better virtual (distributed) teaming practices

Submission

Upload the document to the assignment submission page on myCourses.