Answer the 3 questions below based on the DRE table given.
Phase of Origin |
||||||||||
Phase Found |
|
Req |
Des |
Code |
UT |
IT |
ST |
Field |
Total |
Cum |
Req |
4 |
|
|
|
|
|
|
4 |
4 |
|
Des |
1 |
17 |
|
|
|
|
|
18 |
22 |
|
Code |
1 |
4 |
52 |
|
|
|
|
57 |
79 |
|
UT |
1 |
1 |
6 |
1 |
|
|
|
9 |
88 |
|
IT |
2 |
14 |
25 |
2 |
5 |
|
|
48 |
136 |
|
ST |
9 |
24 |
6 |
1 |
1 |
42 |
|
83 |
219 |
|
Field |
37 |
15 |
11 |
1 |
3 |
14 |
1 |
82 |
301 |
|
Total |
55 |
75 |
100 |
5 |
9 |
56 |
1 |
301 |
|
|
Cum |
55 |
130 |
230 |
235 |
244 |
300 |
301 |
|
|
|
|
(Illustrative example, not real data) |
1)
What is the
Defect Removal Effectiveness (DRE) for the Requirements and the Implementation
(coding) Phase?
2)
How effective
are design inspections at making sure that design defects are contained in the
phase, that is, detected soon after they are created?
3) If the code size is 250 KLOC, what is the injection rate for coding defects?