Measurements

  • Percentage of requirements that change every week
  • Scheduler overage (differences between actual and estimated task completion dates)
  • Number of individual hours spent on specific tasks every week, categorized based on the type of activity (e.g. requirements, design, implementation, test, etc)
  • Feature value for each completed activity (assigned by a team vote)
  • Total number of defects in the code base
  • Total SLOC measurements
  • Time between bug introduction and fix

Process Metrics

  • Schedule slippage
  • Earned feature completion value
  • Categorized time spent on activities per week
  • Requirements volatility

Product Metrics

  • Defect density
  • Bug fix velocity (average time to fix bugs)