Project Deliverables

  • Project Schedule-Baselined (MS Project) (01/24/2006)
  • Project Schedule (MS Project) (05/01/2006)
  • Risk Management Plan (05/21/2006)
  • Requirements Document (04/01/2006)
  • Change Management (01/31/2006)
  • Project Plan (1/30/2006)
  • Project Presentation (2/21/2006)

Design Deliverables

  • UI Prototype/Flow (02/14/2006)
  • Use Cases (03/12/2006)
  • High Level Architecture/Detailed Design (Visio 2003) (04/18/2006)

Testing Deliverables

  • Acceptance Test Plan (03/16/2006)
  • System Test Plan (03/16/2006)
  • System Integration Test Plan (03/16/2006)
  • Unit Test Plan (03/16/2006)
  • Error Messages (03/15/2006)

Technical Report

  • Technical Report (05/24/2006)